Band 6.5 IELTS Writing Task 1 Model Answer
Overall Band Score: 6.5 · Cambridge IELTS 16 · 2026-11-27
IELTS Writing Task 1 question
The diagram below shows the manufacturing process for making sugar from sugar cane.
Summarise the information by selecting and reporting the main features, and make comparisons where relevant.
How sugar is produced from sugar cane
Student answer (Band 6.5)
The illustration demonstrates the manufacturing procedure of make sugar from sugar cane.
Overall,the procedure includes seven distinct stages beginning with the growth of the sugar cane and then processing it and at the end of this long process sugar is created.
Firstly crops for the sugarcane are planted and then grown,which takes about atleast 12 to 18 months to fully grow.After they have been fully raised they are harvested which involves a person cutting them or it can a machine such as a tractor.Afterwards,these canes are crushed to produce juice which is then purified using a limestonefilter.
Moreover,this purified juice is then heated using fire,the juice is inside a evaporator which converts this juice into syrup.In addition to this,a machine known as centrifuge seprates the sugar crystals from the syrup.Finally sugar is produced and, the last step involves storing the sugar inside an container,after which it is dried and then cooled..
AI examiner evaluation
| Criterion | Band |
|---|---|
| Task Achievement / Task Response | 7.0 |
| Coherence and Cohesion | 7.0 |
| Lexical Resource | 6.0 |
| Grammatical Range and Accuracy | 5.5 |
| Overall | 6.5 |
Task Achievement / Task Response: Band 7.0
The response gives a clear account of the process from growing sugar cane through harvesting, crushing, purification, evaporation and centrifuging, and it identifies the overall sequence as seven stages. It also includes the stated growing period and both harvesting methods, so the main features are covered accurately. The final stage is less precise: the diagram shows sugar being dried and cooled, whereas the response says it is stored in a container before those actions. The overview is relevant but general; it could more clearly distinguish the agricultural stages from the subsequent processing stages. Overall, the key information is selected and reported, with only a small imprecision in describing the ending.
Coherence and Cohesion: Band 7.0
The stages are presented in a logical order, and sequencing expressions such as “Firstly,” “Afterwards,” “Moreover,” and “Finally” help the reader follow the process. The opening overview also gives the reader a useful sense of the sequence before the details begin. However, the response is written as one continuous paragraph, so the overview and stage-by-stage description are not visually separated. Some transitions are slightly mechanical, particularly the repeated use of additive markers, and the final sentence combines storage, drying and cooling in a way that makes the sequence less clear. Grouping the overview separately and using more precise links between stages would make the progression more polished.
Lexical Resource: Band 6.0
The response uses an adequate range of process vocabulary, including “harvested,” “crushed,” “purified,” “evaporator,” and “centrifuge,” which allows the main stages to be communicated. Some less common terms are used, though accuracy and natural collocation are uneven: “manufacturing procedure of make” is awkward, “fully raised” is not a natural description of crops, and “storing the sugar” is not shown in the diagram. There are also spelling and spacing errors, including “limestonefilter” and “seprates.” These do not prevent understanding, but they reduce precision and control. Prefer concise process language such as “the production process,” “the cane is mature,” and “the sugar is dried and cooled.”
Grammatical Range and Accuracy: Band 5.5
There is some variety in sentence structure, including a relative clause in “which takes about…” and a passive construction in “are harvested.” However, several grammatical errors remain. The opening phrase “procedure of make sugar” needs a gerund or infinitive construction, and “it can a machine” is missing a verb. Articles and agreement are also inconsistent in “inside a evaporator” and “inside an container.” Punctuation and spacing need attention: there is no space after several commas, and the response ends with a double full stop. These issues do not obscure the overall process, but they limit accuracy. Practise checking each sentence for a complete verb, correct articles, and punctuation.
See this exact question answered at other band scores. The same prompt compared across bands.
Browse more IELTS Writing model answers or get your own writing scored by the same AI examiner.