Band 5.5 IELTS Writing Task 1 Model Answer
Overall Band Score: 5.5 · Cambridge IELTS 12 · 2026-11-17
IELTS Writing Task 1 question
The diagram below shows how geothermal energy is used to produce electricity.
Summarise the information by selecting and reporting the main features, and make comparisons where relevant.
Student answer (Band 5.5)
The black and white represents here is of the Geothermal power plant. Basically Geothermal power plant is use to generate energy inform of electricity. Electricity is essential now a days in our daily lives as it is a necessity for every person.
Now coming on to the process, Firstly Cold water is stored into a large water tank and cold water is released down into the injected well which is 4.5 KM deep. The cold water when reached the depth towards the geothermal zone which consist of the hot rocks. the cold water goes through the geothermal zone and reaches towards the production well where hot water is pumped up and goes to the condenser, the water is condense into steam which goes inside the turbine and powers the turbine which starts the generator and generates the electricity.
when compared this geothermal power plant with wind power plant the difference is wind turbines have large fans on high altitudes which get powered by the speed of wind, helps it to produce energy turbine and generator remains the same.
AI examiner evaluation
| Criterion | Band |
|---|---|
| Task Achievement / Task Response | 5.5 |
| Coherence and Cohesion | 5.5 |
| Lexical Resource | 5.5 |
| Grammatical Range and Accuracy | 5.0 |
| Overall | 5.5 |
Task Achievement / Task Response: Band 5.5
You identify the main stages accurately: cold water is sent down a 4.5 km injection well, heated by the hot rocks, brought up through the production well, and converted to steam to drive the turbine and generator. This gives the reader a generally clear account of the process. However, the response does not provide a distinct overview of the system’s overall operation, and the opening comments about electricity being essential do not describe the diagram. The final comparison with a wind power plant is not requested and introduces information that is not shown, while the generator’s connection to electricity transmission is omitted. Focus on the diagram and summarise its key stages in a concise overview before describing them.
Coherence and Cohesion: Band 5.5
The response has a recognisable sequence, moving from the water tank through the underground wells to the turbine and generator. Sequencing words such as “Firstly” and “Now coming on to the process” help signal this progression. However, the organisation is weakened by the general introduction, the long process sentence, and the unrelated final comparison with wind power. Several stages are crowded into one sentence, making the relationships between them harder to follow. Paragraphing is limited, and transitions such as “when compared” do not support the main process description. Use a short introduction and overview, then organise the stages in a clear sequence, with sentence breaks at the change from underground heating to electricity generation.
Lexical Resource: Band 5.5
You use relevant process vocabulary, including “injection well,” “geothermal zone,” “production well,” “condenser,” “steam,” and “turbine,” which allows the main stages to be understood. Some wording is imprecise or repetitive, however: “cold water” appears repeatedly, and “the water is condense into steam” does not express the process naturally. Phrases such as “the black and white represents here is of” and “energy inform of electricity” are awkward and make the opening less clear. Aim for accurate process collocations, for example, water is “pumped down,” “heated,” and “converted into steam.” Avoid adding vocabulary about wind power, as it is outside the diagram and does not help describe the information.
Grammatical Range and Accuracy: Band 5.0
The response attempts both simple and extended sentence forms, and the sequence can generally be followed. However, errors are frequent, particularly in verb forms, agreement, articles, and sentence boundaries. For example, “Geothermal power plant is use” needs a passive form, while “the water is condense into steam” also has an incorrect verb form. The sentence beginning “The cold water when reached the depth” is incomplete, and the long sentence joining the wells, condenser, turbine, and generator needs clearer punctuation or division. Capitalisation at the start of sentences is inconsistent, as in “when compared.” Practise accurate passive constructions for processes and use shorter, complete sentences to describe each stage.
See this exact question answered at other band scores. The same prompt compared across bands.
Browse more IELTS Writing model answers or get your own writing scored by the same AI examiner.
