Band 6.0 IELTS Writing Task 1 Model Answer
Overall Band Score: 6.0 · Cambridge IELTS 12 · 2026-11-17
IELTS Writing Task 1 question
The diagram below shows how geothermal energy is used to produce electricity.
Summarise the information by selecting and reporting the main features, and make comparisons where relevant.
Student answer (Band 6.0)
The diagram presents the information about the process of producing electricty by using geothermal energy.
Overall,it is evident that the whole process consists of 5 stages.The procedure starts from using cold water and ends with producing electricity.
Upon closer inspection,we can see that the cold water travels to the injection well which is 4.5km down from the earth level by using a pump.In the following step,the water then goes from the inejction well to the production well through Geothermal zone where the hot rocks are siuated.Before condensing ,the hot water is pumped up to the ground level where the condenser is present.At this point,by using the condenser steam is produced from the hot water which gives the required energy to run the turbine.In the following step, a generator is connected to the turbine which tranforms the energy and produce electricity.In the final step,the produced current is supplied through the tranmission line to the desired destination.
AI examiner evaluation
| Criterion | Band |
|---|---|
| Task Achievement / Task Response | 6.0 |
| Coherence and Cohesion | 6.5 |
| Lexical Resource | 5.5 |
| Grammatical Range and Accuracy | 5.5 |
| Overall | 6.0 |
Task Achievement / Task Response: Band 6.0
You cover the main sequence from cold water entering the injection well to electricity being generated, and the overview correctly identifies the process’s beginning and end. You also include the important depth of 4.5 km and explain how water is heated underground before returning to the surface. However, the overview is limited to the number of stages and the endpoints; it could more clearly summarise the transformation from cold water to steam and the role of the turbine and generator. Some details are unclear or not fully accurate: the water passes through the geothermal zone from the injection well to the production well, rather than simply going “from” one well “to” the other, and the generator produces electricity rather than transforming energy in the way stated. A more precise overview and clearer stage descriptions would strengthen coverage.
Coherence and Cohesion: Band 6.5
The response has a clear overall progression: an introduction and overview are followed by the stages in sequence, from pumping water underground to generating and transmitting electricity. Connectors such as “Overall,” “Upon closer inspection,” “In the following step,” and “In the final step” help guide the reader, and the process is generally easy to follow. This organisation is effective, though the repeated step-by-step transitions make the cohesion somewhat mechanical. The paragraphing also leaves the overview and detailed account in one continuous block, so separating these functions would make the structure clearer. Some links between stages could be more precise—for example, explain directly that the heated water rises through the production well and is then converted to steam in the condenser. The logical progression is already present; more varied, precise linking would improve it.
Lexical Resource: Band 5.5
You use relevant process vocabulary, including “injection well,” “production well,” “geothermal zone,” “condenser,” “turbine,” and “generator,” which allows the reader to understand the main equipment and stages. There is also some useful variation in describing movement and production, such as “pumped up” and “supplied.” However, spelling errors are noticeable, including “electricty,” “inejction,” “siuated,” “tranforms,” and “tranmission.” Some word choices and collocations are imprecise: “earth level” is less natural than “ground level,” and “the required energy to run the turbine” could be expressed more directly as steam powering the turbine. “Desired destination” is vague for electricity transmission. Aim for accurate spelling and more precise process collocations while retaining the relevant technical terms you already use.
Grammatical Range and Accuracy: Band 5.5
You attempt a mix of sentence forms, including a complex description of the water’s route through the geothermal zone and a sequence of clauses explaining the condenser, turbine, and generator. The meaning is generally recoverable, but some grammatical errors remain. For example, “the whole process consists of 5 stages” is followed by “starts from using,” where a more natural construction is “starts with cold water being pumped down.” In “a generator … tranforms the energy and produce electricity,” the verbs do not agree; the subject requires “produces.” The sentence beginning “Before condensing” also leaves the subject of the action unclear. Punctuation spacing after commas is inconsistent, and several sentences run together without clear paragraph breaks. More controlled verb forms, clause construction, and punctuation would improve accuracy.
See this exact question answered at other band scores. The same prompt compared across bands.
Browse more IELTS Writing model answers or get your own writing scored by the same AI examiner.
