Band 6.0 IELTS Writing Task 1 Model Answer

Overall Band Score: 6.0 · Cambridge IELTS 12 · 2026-11-17

IELTS Writing Task 1 question

The diagram below shows how geothermal energy is used to produce electricity.

Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

Student answer (Band 6.0)

The given diagram illustrates the method of producing electricity with the help of geothermal energy.

Overall, water was the main component of the whole process which was used to produce steam passed through the geothermal zone. The turbines who powered the generator was moved with the help of steam. These generators produce electricity.

Regarding the geothermal zone, the cold water pumped down to the earth upto 4.5 km. The water entered the injection well which was the passage to geothermal zone. Geothermal zone consisted of hot rocks and water after passing through the hot rocks also became hot. Afterwards, water was pushed into the production well. Then, the hot water pumped up to the earth surafce.

Turning to the last steps, after reaching to surface water became condensed and converted into steam. Then, the steam was provided to turbine which was attached to the generator. Steam powered turbines and turbines started to rotate. The rotating turbines provided power to the generators. The generators produced electricity and gave it to the electricity towers.

AI examiner evaluation

CriterionBand
Task Achievement / Task Response6.0
Coherence and Cohesion6.5
Lexical Resource5.5
Grammatical Range and Accuracy5.5
Overall6.0

Task Achievement / Task Response: Band 6.0

The response covers the main sequence from pumping cold water underground to generating electricity, and it includes the key depth of 4.5 km. The overview also identifies water, steam, the turbine and generator as central to the process. However, some details are unclear or inaccurate: the water is heated as it passes through the geothermal zone, but the overview says steam passes through that zone; steam is produced after the hot water reaches the surface and enters the condenser. The description of the condenser as water becoming “condensed” reverses or obscures this stage. The account is relevant throughout, but the overview and some process details need more precise development and clearer reporting of the diagram’s stages.

Coherence and Cohesion: Band 6.5

The response has a coherent overall arrangement: it begins with an overview, describes the underground stages, and then moves to the equipment that generates electricity. Sequencing expressions such as “Afterwards,” “Then,” and “Turning to the last steps” help the reader follow the process. This organisation is effective, though some links are mechanical and the reference in “These generators” is unclear because only one generator is shown. The overview also repeats information that is explained later, while the transition to the final stages could more clearly connect the production well, condenser and steam. More precise referencing and smoother links between stages would make the progression more natural.

Lexical Resource: Band 5.5

The response uses relevant process vocabulary, including “injection well,” “production well,” “geothermal zone,” “turbine” and “generator,” which allows the main stages to be identified. However, several word choices and collocations are imprecise: “water became condensed” does not clearly describe steam being produced, and “electricity towers” is less accurate than “transmission pylon.” There are also spelling errors in “upto” and “surafce,” and “turbines started to rotate” is a less concise way to describe the turbine being driven by steam. The range is adequate for the topic, but greater precision in technical terms and more natural collocations would improve clarity.

Grammatical Range and Accuracy: Band 5.5

The response includes both simple sentences and some longer structures, such as “The water entered the injection well which was the passage to geothermal zone.” Most stages remain understandable, but some grammatical errors recur. For example, “The turbines who powered the generator was moved” has incorrect relative-pronoun choice and subject–verb agreement; “the cold water pumped down” is missing an auxiliary verb, and “water became condensed” uses an unclear construction. Articles are also omitted in “to geothermal zone” and “to surface.” These errors do not generally prevent the reader from following the process, but more consistent control of verb forms, agreement and articles is needed, especially in complex sentences.

See this exact question answered at other band scores. The same prompt compared across bands.

Browse more IELTS Writing model answers or get your own writing scored by the same AI examiner.