Band 5.5 IELTS Writing Task 1 Model Answer
Overall Band Score: 5.5 · Cambridge IELTS 12 · 2026-11-18
IELTS Writing Task 1 question
The diagram below shows how geothermal energy is used to produce electricity.
Summarise the information by selecting and reporting the main features, and make comparisons where relevant.
Student answer (Band 5.5)
The given diagram illustrates that how geothermal energy is utilize to produce electricity, while geothermal power plant divided into five sub-activities.
Overll,activities include cold water, the injection well, the production well, condenser, and generator turbine, whereas starting from cold water and ends with powered by turbine and produce electricity.
Firstly, the cold water under the earth 4.5km with pumped down then adding the injection well and geothermal zone in the production well and then the hot water pumped up. There is a pool between them where hot and cold water available.
secondly, hot water pumped up in the condenser and attach to the steam , in this turdine they create a steam and steam water into the generator and generator connect to the power turbine . Both generator turbine and power turbine produces electricity. all of these system attach to the electricity toer that helps to dvelop electricity through their tubines.
AI examiner evaluation
| Criterion | Band |
|---|---|
| Task Achievement / Task Response | 5.5 |
| Coherence and Cohesion | 5.5 |
| Lexical Resource | 5.0 |
| Grammatical Range and Accuracy | 5.0 |
| Overall | 5.5 |
Task Achievement / Task Response: Band 5.5
You identify the process as geothermal electricity production and include several relevant stages, such as water being pumped underground, heated, brought back up, and used to generate electricity. However, the overview is unclear and partly inaccurate: the plant has five numbered stages, but the turbine and generator are separate components, and the process ends with electricity being produced by the generator. Some details are also misreported. For example, the water is not pumped down “4.5km with” the injection well; 4.5 km indicates the well’s depth. The condenser releases steam, which powers the turbine, and the turbine drives the generator. The description of a pool containing hot and cold water is not shown. A clearer overview and more accurate account of the sequence would make the response more complete.
Coherence and Cohesion: Band 5.5
The response has an opening, an overview, and two body sections, and words such as “Firstly” and “secondly” show an attempt to order the stages. However, progression is difficult to follow because several steps are combined in long, unclear sentences. For instance, “adding the injection well and geothermal zone in the production well” does not clearly explain how water travels through the hot rocks, while the final sentence introduces the electricity tower and turbines without a clear connection to the preceding stages. The overview also repeats a list of components rather than summarising the process. Use one paragraph for the underground water cycle and another for steam, turbine, and generator, with clear links such as “after heating” and “finally.”
Lexical Resource: Band 5.0
You use some relevant process vocabulary, including “injection well,” “production well,” “condenser,” and “geothermal zone,” so the topic is recognisable. However, the range is limited and several word choices or collocations make the process hard to understand. “Attach to the steam” does not describe what the condenser does, and “steam water into the generator” is not an accurate expression for the flow of energy. There are also noticeable spelling errors, including “Overll,” “turdine,” “toer,” and “dvelop.” Aim for precise process verbs such as “heat,” “rise,” “release,” “power,” and “drive,” and check spelling carefully. Repeating “generator turbine” and “power turbine” also obscures the distinction between the two machines.
Grammatical Range and Accuracy: Band 5.0
The response attempts both simple and longer sentences, but control is inconsistent, and faulty sentence structures often make relationships between stages unclear. For example, “The given diagram illustrates that how geothermal energy is utilize” has an incorrect clause pattern and verb form; “geothermal power plant divided into five sub-activities” is missing a form of “be.” In “the hot water pumped up,” the passive verb also needs an auxiliary. Several sentences join multiple actions without clear grammatical links, particularly the final two sentences. Use complete subject–verb structures and consistent passive forms, for example, “Cold water is pumped down the injection well” and “The hot water is then brought to the surface.” More accurate sentence boundaries and punctuation would improve readability.
See this exact question answered at other band scores. The same prompt compared across bands.
Browse more IELTS Writing model answers or get your own writing scored by the same AI examiner.
