Band 5.5 IELTS Writing Task 1 Model Answer

Overall Band Score: 5.5 · Cambridge IELTS 12 · 2026-11-19

IELTS Writing Task 1 question

The diagram below shows how geothermal energy is used to produce electricity.

Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

Student answer (Band 5.5)

The process diagram illustrates in 5 stages the manufacturing of electricity in a geothermal power plant.

According to the diagram, during the initial phase, it is manifest that cold water was pumped down through the injection well which is 4.5 kilometers long to the underground geothermal zone. The second stage is that the geothermal zone full of hot rocks when cold water pass here to the production well it would be heated.

Then hot water would be pumped up to condenser via the production well which has the same distance with the injection well and comes the four satge, which is that hot water was transformed into steam. In the final part included in the production process is that steam through a turbine which would be powerd by steam and lead to useable electric current was produced by a generator.

Overall, the producing of electricity consists of a few simple steps, each of which has different requirement.

AI examiner evaluation

CriterionBand
Task Achievement / Task Response5.5
Coherence and Cohesion6.0
Lexical Resource5.5
Grammatical Range and Accuracy5.0
Overall5.5

Task Achievement / Task Response: Band 5.5

You identify the main process stages, including water being pumped underground, heated by hot rocks, returned to the surface, and converted to steam before electricity is generated. The 4.5-kilometre depth is also reported accurately. However, the account is not fully clear or complete: the opening says there are five stages, but the sequence is difficult to follow, and the generator’s role is only briefly mentioned. The claim that the production well has the same distance as the injection well is not supported by the diagram. The overview, “a few simple steps,” is too general to highlight the key transformation from cold water to steam and the turbine-generator sequence. Make the overview more informative and describe each stage precisely.

Coherence and Cohesion: Band 6.0

The response has an overall chronological structure, using phrases such as “during the initial phase,” “Then,” and “In the final part” to guide the reader through the process. This gives the account a coherent basic progression. However, the stage numbering is confusing: “the second stage” introduces the geothermal zone, while “the four satge” appears later, and the opening reference to five stages does not help clarify the sequence. Some links between ideas are also awkward, particularly the long sentence beginning “Then hot water would be pumped up.” Separate the stages into clearer sentences or paragraphs and use consistent sequencing language so that each transition is easy to follow.

Lexical Resource: Band 5.5

You use relevant process vocabulary, including “injection well,” “geothermal zone,” “production well,” “condenser,” “steam,” and “turbine.” These terms show an adequate grasp of the diagram’s subject. However, several choices or forms are inaccurate or unnatural, such as “manufacturing of electricity,” “the same distance with,” and “useable electric current.” There are also spelling errors in “satge” and “powerd,” which reduce precision. Aim for standard process collocations and accurate word forms; for example, describe electricity as being “generated” and water as being “heated” as it passes through the hot-rock zone. This would make the description more natural and precise.

Grammatical Range and Accuracy: Band 5.0

You attempt both simple and more complex sentences, including a time clause in “when cold water pass here” and a relative clause describing the turbine. However, complex structures are often faulty, and errors sometimes make the sequence difficult to interpret. Examples include “the geothermal zone full of hot rocks when cold water pass here,” which lacks a complete grammatical structure, and “steam through a turbine … was produced by a generator,” where the relationship between the actions is unclear. Verb forms and agreement also need attention: “cold water pass” should be “cold water passes,” while the process is more naturally described consistently in the present simple. Use shorter, complete sentences to explain each stage, then add complex clauses once their structure is secure.

See this exact question answered at other band scores. The same prompt compared across bands.

Browse more IELTS Writing model answers or get your own writing scored by the same AI examiner.