Band 6.0 IELTS Writing Task 1 Model Answer
Overall Band Score: 6.0 · Cambridge IELTS 12 · 2026-11-22
IELTS Writing Task 1 question
The diagram below shows how geothermal energy is used to produce electricity.
Summarise the information by selecting and reporting the main features, and make comparisons where relevant.
Student answer (Band 6.0)
THE DIAGRAM ILLUSTRATES THE PROCESS OF PRODUCTION OF ELECTRICITY FROM GEOTHERMAL ENERGY.
OVERALL,THE PROCESS CONSISTS OF 5 MAIN STAGES, BEGINNING WITH PUMPING OF COLD WATER THROUGH GEOTHERMAL ZONE AND ENDING WITH GENERATION OF ELECTRICITY THROUGH TURBINE AND GENERATOR.THE MAIN STAGES ARE COLD WATER PUMPING AND STORAGE, HOT WATER STORAGE AND PUMPING UP, CONDENSATION AND STEAM DRIVEN TURBINE GENERATING ELCTRICITY VIA GENERATOR.
INITIALLY COLD WATER IS PUMPED 4.5KM DEEP INTO THE INJECTION WELL,WHICH IS CONNECTED TO THE GEOTHERMAL ZONE THROUGH WATER CHANNELS. AFTER PASSING THROUGH THE HOT ROCKS IT IS STORED INTO THE PRODUCTION WELL.
AT THIS STAGE IT IS PUMPED UP INTO THE CONDENSER. IN THE PROCESS OF CONDENSATION HOT WATER IS CONVERTED INTO THE STEAM. THIS STEAM ACTS AS SOURCE OF ENERGY TO RUN THE TURBINE. THE POWERED TURBINE IS CONNECTED TO THE GENERATOR WHICH IN TURN GENERATES THE ELECTRICITY.THAT IS CARRIED TO THE POWER HOUSES VIA LARGE ELECTRICITY POLLS.
AI examiner evaluation
| Criterion | Band |
|---|---|
| Task Achievement / Task Response | 6.5 |
| Coherence and Cohesion | 6.0 |
| Lexical Resource | 6.0 |
| Grammatical Range and Accuracy | 5.5 |
| Overall | 6.0 |
Task Achievement / Task Response: Band 6.5
You cover the main sequence from cold-water injection to electricity generation, and the overview identifies the process’s beginning and end. The 4.5 km depth and the roles of the turbine and generator are also reported accurately. This gives the account a clear, relevant foundation. However, some details are unclear or inaccurate: water is said to be “stored into the production well,” whereas the diagram shows it passing through the hot-rock zone and being pumped up the production well. The condenser converts hot water into steam, but describing this as “the process of condensation” misidentifies the stage. The overview also lists “hot water storage,” which is not shown. More precise reporting of these stages would make the coverage more complete and developed.
Coherence and Cohesion: Band 6.0
The response has a recognisable structure: an introduction, an overview and a chronological description. Sequencing expressions such as “Initially” and “At this stage” help the reader follow the process, and the progression from underground water movement to electricity generation is generally logical. However, the overview repeats several stages in a list, and the body’s transitions sometimes leave relationships unclear—for example, “After passing through the hot rocks it is stored into the production well” does not clearly explain that the water is pumped upward. The final sentence also joins two complete ideas without a space or clear punctuation. Use paragraphing and linking more deliberately, and make each transition show exactly how one stage leads to the next.
Lexical Resource: Band 6.0
You use a suitable range of process vocabulary, including “injection well,” “geothermal zone,” “condenser,” “turbine” and “generator,” so the subject is generally clear. There are also attempts at more specific phrasing, such as “steam driven turbine.” However, several word choices or collocations are inaccurate or unnatural: “stored into the production well” does not describe the diagram’s movement, “power houses” is not the appropriate term for the transmission destination, and “electricity polls” appears to mean electricity pylons. “Condensation” is also used for the conversion of hot water into steam, which is a vocabulary error that affects precision. Check technical terms and common collocations, and avoid repeating “process” and “stage” when a more exact verb can describe the action.
Grammatical Range and Accuracy: Band 5.5
You attempt both simple and complex forms, including the relative clause in “the generator which in turn generates the electricity” and the time clause “After passing through the hot rocks.” These structures help convey sequence, and the main meaning is usually understandable. Some grammatical and punctuation errors remain, however. In “the process consists of 5 main stages,” the stages are not consistently presented as five distinct steps; more importantly, “it is stored into the production well” uses an unsuitable passive construction and preposition for the intended movement. Missing spaces after full stops and commas, as in “GENERATOR.THE” and “WELL,WHICH,” also weaken accuracy. Use clearer active or passive forms for each action, and proofread sentence boundaries, articles and prepositions.
See this exact question answered at other band scores. The same prompt compared across bands.
Browse more IELTS Writing model answers or get your own writing scored by the same AI examiner.
