Band 4.5 IELTS Writing Task 1 Model Answer
Overall Band Score: 4.5 · Cambridge IELTS 12 · 2026-11-22
IELTS Writing Task 1 question
The diagram below shows how geothermal energy is used to produce electricity.
Summarise the information by selecting and reporting the main features, and make comparisons where relevant.
Student answer (Band 4.5)
Basically the geothermal power plant work like one cold water tank on ground surface and connet with pump cold water pump connect with hot water pump in underground hot water pump puch water in condenser and condenser generate heat in huge amount and condenser push stream in to turbine in next step turbine in few steps steam doing further process and connect with generator when heat generated then generator produce electricity then supply using tower wires
AI examiner evaluation
| Criterion | Band |
|---|---|
| Task Achievement / Task Response | 4.0 |
| Coherence and Cohesion | 5.0 |
| Lexical Resource | 5.0 |
| Grammatical Range and Accuracy | 4.0 |
| Overall | 4.5 |
Task Achievement / Task Response: Band 4.0
The response identifies the general subject and mentions several relevant components, including the cold-water tank, condenser, turbine, generator and electricity supply. However, it reports the process only minimally and contains important inaccuracies: the water is not pumped directly from one pump to another, and the condenser does not generate heat; water is heated underground by hot rocks before being brought to the surface and converted to steam. The stages are not clearly explained, and there is no overview of the process as a whole. The response is also substantially below the required 150 words, leaving too little detail to summarise the main features adequately. To improve, describe the full sequence accurately and include the underground wells and geothermal zone.
Coherence and Cohesion: Band 5.0
There is a basic attempt to present events in sequence, using phrases such as “in next step” and “then,” and the reader can recognise a rough movement from the tank towards electricity production. However, the response is one long, run-on sentence, so the stages are difficult to distinguish and the progression is not consistently clear. Some links are also confusing, as in “connect with pump cold water pump connect with hot water pump.” Organise the description into clear sentences, ideally separating the underground heating stage from the surface equipment, and use precise sequencing expressions such as “first,” “after this,” and “finally.” This would give the process a clearer overall progression.
Lexical Resource: Band 5.0
The response uses a small set of relevant process words, including “condenser,” “turbine,” “generator,” and “electricity,” which helps identify the topic. However, vocabulary is limited and repetitive, particularly the repeated use of “pump,” “connect,” and “generate.” Several choices are inaccurate or unclear: “condenser generate heat” misrepresents the equipment’s role, while “push stream” appears to mean that steam is sent to the turbine. Spelling errors such as “connet” and “puch” also make parts harder to understand. Build a more precise range of process vocabulary, for example “is pumped down,” “is heated by hot rocks,” “rises to the surface,” and “drives the turbine,” and check spelling carefully.
Grammatical Range and Accuracy: Band 4.0
The response attempts to describe a sequence, but it relies on a single extended sentence with very limited control of sentence boundaries. Errors in verb forms and agreement occur frequently, as in “the geothermal power plant work” and “condenser generate,” where the subject and verb do not agree. The phrase “when heat generated then generator produce electricity” also lacks the necessary auxiliary and has an incorrect verb form. These problems sometimes distort the relationships between stages and make the process difficult to follow. Use short, complete sentences first, with a clear subject and verb in each, and practise passive forms suited to process descriptions, such as “Cold water is pumped underground” and “Steam is sent to the turbine.”
See this exact question answered at other band scores. The same prompt compared across bands.
Browse more IELTS Writing model answers or get your own writing scored by the same AI examiner.
