Band 5.5 IELTS Writing Task 1 Model Answer

Overall Band Score: 5.5 · Cambridge IELTS 12 · 2026-11-23

IELTS Writing Task 1 question

The diagram below shows how geothermal energy is used to produce electricity.

Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

Student answer (Band 5.5)

Introduction

The diagram illustrates the production of electricity through geothermal energy process.

Overview

For this purpose we use a different types of equipments such as generator, turbine, condenser, injection well, production well and cold water tub.

Body paragraph

At the beginning, cold water is injected at the depth of 4.5 km through injection well.This water passes through geothermal Zone(hot rocks) and reach the production well, at this stage cold water pump down and hot water pumped up. when hot water pumped up condenser start producing a steam into water. when water becomes a steam, now at this stage turbines powered the steam water, these turbines runs through generator and produced electricity.

Conclusion

overall, in this process we generated electricity through earth and thermal energy that gains from earth hot rocks because geao mean eart and thermal mean heat production of electricity by using earth's hotness. and this is very useful for environment because it has no harmful effects but one drawback is that its a high cost process

AI examiner evaluation

CriterionBand
Task Achievement / Task Response5.5
Coherence and Cohesion5.5
Lexical Resource5.5
Grammatical Range and Accuracy5.0
Overall5.5

Task Achievement / Task Response: Band 5.5

You identify the main stages, including water being sent down the injection well, heated by underground rocks, brought up through the production well, and used to generate electricity. The 4.5 km depth is also reported accurately. However, the overview mainly lists equipment rather than summarising the process’s key transformation, and some details are unclear or inaccurate: the condenser is described as producing steam “into water,” and the final explanation adds claims about environmental effects and cost that are not shown in the diagram. To strengthen the response, give a concise overview of the full sequence and describe only the features presented, including steam driving the turbine and the turbine powering the generator.

Coherence and Cohesion: Band 5.5

The response has a recognisable introduction, overview, and process description, and the stages are generally presented in the correct order. Sequencing phrases such as “At the beginning” and “at this stage” help the reader follow the process. However, the separate conclusion repeats the general idea and introduces unrelated evaluation, while the overview is an equipment list rather than a useful summary. Some links are awkward or unclear, particularly “when water becomes a steam, now at this stage,” and several ideas are crowded into long sentences. Organise the body into clear stages and use precise links to show how each stage leads to the next.

Lexical Resource: Band 5.5

You use relevant process vocabulary, including “injection well,” “production well,” “geothermal zone,” “condenser,” and “generator,” which helps communicate the subject. However, word choice and collocation are often imprecise: “cold water tub” is not the appropriate term for the storage tank, “producing a steam into water” is unclear, and “turbines runs through generator” does not express the relationship accurately. There are also spelling and word-form problems, such as “geao” and “equipments.” Aim for accurate technical phrasing and avoid informal or speculative expressions. For example, describe water as being heated underground and steam as driving the turbine.

Grammatical Range and Accuracy: Band 5.0

The response attempts both simple and more connected sentences, and the reader can usually identify the intended sequence. However, errors are frequent and sometimes make relationships difficult to understand. Examples include “a different types of equipments,” “water passes … and reach,” and “these turbines runs … and produced,” where articles, agreement, and verb forms are not controlled. Sentence boundaries and punctuation also need attention: “injection well.This” lacks a space, and several clauses are joined without clear punctuation. Practise writing short, accurate process sentences first, then combine them with controlled clauses, for example: “The water is heated as it passes through the hot rocks, then it is pumped to the surface.”

See this exact question answered at other band scores. The same prompt compared across bands.

Browse more IELTS Writing model answers or get your own writing scored by the same AI examiner.