Band 5.5 IELTS Writing Task 1 Model Answer
Overall Band Score: 5.5 · Cambridge IELTS 12 · 2026-11-24
IELTS Writing Task 1 question
The diagram below shows how geothermal energy is used to produce electricity.
Summarise the information by selecting and reporting the main features, and make comparisons where relevant.
Student answer (Band 5.5)
The provided diagram illustrates how geothermal energy is used to produce eletricity from water.
Overall, there are main five stages where electricity generate. These steps iare involved cold water, the injection well, production well, condenser is the mojar one and ultimately turbine which is the quite essential last stage.
Initially the cold water comes from mountains or stored in a dam, by help of pump water pumped down under the earth approximately 4.5km lower and subsequently the injection well pushes towards the production well, in this peocess there are a small amount of rocks which heat up due to geothermal zone and cold water transform into hot water after that hot water pumped up in the condenser by the help of pump or air pressure. condenser is a large box type room in which hot water change into steam then steam go towards the turbine and its on due to power of steam. Finally, generator powered by turbine and produce electric enery then energy moves in the wires and the local people use it.
In conclusion, turbine and generator are the important tools to produce electricity, without these its not possib
AI examiner evaluation
| Criterion | Band |
|---|---|
| Task Achievement / Task Response | 6.0 |
| Coherence and Cohesion | 6.0 |
| Lexical Resource | 5.0 |
| Grammatical Range and Accuracy | 5.0 |
| Overall | 5.5 |
Task Achievement / Task Response: Band 6.0
You cover the main sequence from cold-water injection through underground heating to steam-driven electricity generation, and the 4.5 km depth is accurately reported. The overview identifies the process as staged, while the final mention of the turbine and generator recognises key equipment. However, some details are unsupported or inaccurate: the water is not said to come from mountains or a dam, and the diagram does not show a pump or air pressure lifting it to the condenser. The overview also calls the condenser a major stage without clearly summarising the transformation from cold water to electricity. To strengthen the response, describe only visible features and explain more precisely how hot water becomes steam before driving the turbine and generator.
Coherence and Cohesion: Band 6.0
The response has a recognisable overall structure: an introduction, an overview, a chronological account and a concluding sentence. Sequencing expressions such as “Initially,” “subsequently,” “after that” and “Finally” help the reader follow the process. However, the overview is difficult to interpret because it lists stages in an unclear order, and the long body paragraph combines many steps in one sentence chain. Some links are also imprecise, as in “the injection well pushes towards the production well,” which obscures the movement of water. The conclusion repeats the importance of the turbine and generator rather than adding a clear summary. Use separate paragraphs for the overview and process details, and connect each stage with clear, accurate references.
Lexical Resource: Band 5.0
You use relevant process vocabulary, including “injection well,” “production well,” “geothermal zone,” “condenser,” “steam” and “turbine,” which makes the subject recognisable. There is also some attempt to describe movement and transformation, such as water being “pumped down” and changing into steam. However, word choice and collocation are often inaccurate or informal: “a small amount of rocks,” “large box type room,” and “its on due to power of steam” do not describe the diagram naturally. Spelling errors such as “eletricity,” “mojar” and “enery” also reduce precision. Build a more accurate process vocabulary and check spelling; prefer concise terms such as “heated,” “converted” and “drives.”
Grammatical Range and Accuracy: Band 5.0
You attempt both simple and longer sentences, and the chronological account shows an effort to connect several stages in complex structures. Some meaning remains understandable, but errors in verb forms, agreement, articles and sentence boundaries are noticeable. For example, “electricity generate” needs a passive form, while “hot water change into steam” has incorrect agreement and tense. The sentence beginning “Initially the cold water comes…” runs through several actions without clear punctuation, making the relationships between them harder to follow. The final sentence is also incomplete: “without these its not possib”. Practise accurate passive constructions for process descriptions, such as “water is pumped” and “steam is produced,” and divide long sequences into complete sentences.
See this exact question answered at other band scores. The same prompt compared across bands.
Browse more IELTS Writing model answers or get your own writing scored by the same AI examiner.
