Band 5.5 IELTS Writing Task 1 Model Answer

Overall Band Score: 5.5 · Cambridge IELTS 12 · 2026-11-24

IELTS Writing Task 1 question

The diagram below shows how geothermal energy is used to produce electricity.

Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

Student answer (Band 5.5)

The diagram explains the process of converting geothermal energy into electricity through geothermal power plant.

Basically the whole production is dependent on 5 steps.The production begins with the cold water which last up in generator turbine.In addition two different wells are used in the production well.First is injection well and the second one is production well.The injection well recieve the cold water that is pumped down.Whereas the production well pump hot water up.

Inially,cold water is pumped down through four point five kilometers to the injection well.Furthermore this water flow through geothermal zone which is of hot rocks.Therefore the water reach the production well.

Whereas hot water is pumped up to the condenser,from which steam is made.Then steam is pushed to generator turbine.First turbone rotates steam which is the forward to generator which is powered by turbine.This generator produces electricity.This electricity is then dilevered to the electircity towers which supples current.

AI examiner evaluation

CriterionBand
Task Achievement / Task Response6.0
Coherence and Cohesion5.5
Lexical Resource5.0
Grammatical Range and Accuracy5.0
Overall5.5

Task Achievement / Task Response: Band 6.0

You cover the main stages in the correct overall order: cold water is sent underground, heated by the hot rocks, brought back up, converted to steam, and used to drive equipment that generates electricity. The 4.5-kilometre depth and the roles of both wells are also included. This gives the reader a relevant account of the process. However, the overview is not fully clear: “the whole production is dependent on 5 steps” does not identify the key transformation from cold water to electricity, and the opening claim that the water “last up in generator turbine” is inaccurate. The turbine and generator roles are also muddled in places. A concise overview and more precise explanation of these stages would make the account more complete.

Coherence and Cohesion: Band 5.5

The response follows the process from the wells to electricity, and the paragraph break helps separate the initial description from the later stages. Some linking words, such as “Furthermore” and “Therefore,” show an attempt to connect events. However, progression is weakened by unclear or mechanical connections: “In addition two different wells are used” is followed by a confusing description of them, while repeated “Whereas” does not express a clear contrast. The sequence from condenser to steam, turbine, and generator is also difficult to follow because the sentences do not clearly distinguish each stage. Organise the response into a brief overview and a clearly ordered process description, using simple sequencing links such as “Next” and “Finally” where appropriate.

Lexical Resource: Band 5.0

You use relevant process vocabulary, including “injection well,” “production well,” “geothermal zone,” “condenser,” and “electricity,” so the topic is generally recognisable. There are also attempts at more specific wording, such as “pumped down” and “pumped up.” However, noticeable spelling errors (“recieve,” “Inially,” “turbone,” “dilevered,” “electircity”) and imprecise or unnatural phrases reduce clarity. For example, “cold water which last up in generator turbine” does not communicate the intended process, and “electricity towers” is less precise than the diagram’s transmission pylon or power lines. Build accuracy with standard process collocations and check spelling, especially for technical terms.

Grammatical Range and Accuracy: Band 5.0

You attempt both simple and more complex sentences, including a relative clause in “the condenser, from which steam is made” and a sequence linked with “which.” The main stages can usually be understood, but grammatical control is inconsistent. For example, “the production well pump hot water up” has a subject–verb agreement error, and “this water flow” and “the water reach” also need agreement. Articles and sentence boundaries are sometimes missing, as in “through geothermal power plant” and “steps.The production.” Some clauses are difficult to interpret because their structure is incomplete or confused, particularly “First turbone rotates steam which is the forward to generator.” Use complete sentences with clear subjects and verbs, and check agreement, articles, and punctuation.

See this exact question answered at other band scores. The same prompt compared across bands.

Browse more IELTS Writing model answers or get your own writing scored by the same AI examiner.