Band 6.0 IELTS Writing Task 1 Model Answer

Overall Band Score: 6.0 · Cambridge IELTS 12 · 2026-11-25

IELTS Writing Task 1 question

The diagram below shows how geothermal energy is used to produce electricity.

Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

Student answer (Band 6.0)

The diagram shows step by step process of generating electricity from geothermal energy.

Overall, there are five steps, starting from pumping cold water to ground to geothermal zone, to produce electricity from generator which is sent to electric grid .

To begin with, cold water pumped down approximately 4.5km to underground by using injection well after that with the help of injection well water is supply to geothermal zone(hot rocks) there water starts boilling by the hot rocks of earth. After boiling hot water is pumped to production well and then production well supply the water to condenser.However, the last two stages are carried out above the ground water. First of all steam is produced from hot water in condenser and release stem into turbine. Turbine begine rotating and produce power by steam.Furthermore, the power is supply to generator and generator produce the electricity from the power. After that the eletricity is supply to electric grid through power lines.

AI examiner evaluation

CriterionBand
Task Achievement / Task Response6.5
Coherence and Cohesion6.5
Lexical Resource5.5
Grammatical Range and Accuracy5.0
Overall6.0

Task Achievement / Task Response: Band 6.5

You cover the main sequence from pumping cold water underground to generating and transmitting electricity, and the overview identifies the process as having five stages. The 4.5 km depth and the roles of the injection and production wells are also reported accurately. This gives the reader a relevant account of the diagram. However, some details are unclear or imprecise: water is heated as it passes through the geothermal zone, but saying it “starts boiling” there is not shown; the diagram indicates that steam is released in the condenser. The explanation of how the turbine drives the generator is also muddled, as you say power is supplied to the generator. More precise reporting of these relationships would make the account more complete.

Coherence and Cohesion: Band 6.5

The response has a recognisable structure: an introduction, an overview, and a chronological description of the process. Sequencing phrases such as “To begin with,” “After,” and “Furthermore” help the reader follow the stages. However, some links are mechanical or confusing. “After that with the help of injection well” repeats information without clearly showing the next movement, while “However” does not express a contrast between the stages. The long final paragraph also combines several steps, and missing spaces after full stops make boundaries harder to see. Use clearer paragraphing and connect each stage directly to the next; for example, explain that heated water rises through the production well before steam passes to the turbine.

Lexical Resource: Band 5.5

You use relevant process vocabulary, including “injection well,” “production well,” “condenser,” “turbine,” and “power lines,” which helps communicate the subject. There is also some attempt to vary wording with phrases such as “pumped down” and “pumped up.” However, the range and control are limited by repeated general words such as “produce” and “power,” and several inaccurate forms or collocations, including “electric grid,” “release stem,” and “supply the water.” Spelling errors such as “boilling,” “begine,” and “eletricity” are noticeable and can distract the reader. Aim for precise process verbs and check spelling, especially for key technical terms.

Grammatical Range and Accuracy: Band 5.0

You attempt to combine stages using longer sentences and sequencing clauses, but control is uneven. Several sentences have problems with articles, verb forms, or agreement: “cold water pumped down” needs a finite verb, “water is supply” should use a correct passive form, and “generator produce” lacks subject–verb agreement. The sentence beginning “To begin with” runs through multiple stages without clear punctuation, and spacing after full stops is inconsistent. These errors sometimes make relationships between steps difficult to follow. Build accuracy with clear passive constructions, which suit a process description—for example, “Cold water is pumped down the injection well”—then add more complex clauses once the basic sentence is secure.

See this exact question answered at other band scores. The same prompt compared across bands.

Browse more IELTS Writing model answers or get your own writing scored by the same AI examiner.