Band 6.0 IELTS Writing Task 1 Model Answer

Overall Band Score: 6.0 · Cambridge IELTS 12 · 2026-11-25

IELTS Writing Task 1 question

The diagram below shows how geothermal energy is used to produce electricity.

Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

Student answer (Band 6.0)

This diagram illustrate the use of geothermal energy for the production of electricity with the help of turbines.

The whole process takes place in a cycle where water pass through different stages to

be able for producing electricity.

The first step is pumping down of the cold water from a surface of Earth.When it covers a distance of about 4.5 km below the Earth,it hit the injection well that turns the direction of its flow towards the geothermal zone from where it reaches the production well.

The second step includes the flow of water which has now turned hot in the upward direction.The production well pumps the water outwards into a condenser.The steam of hot water get trapped in the condenser.The steam then enters the turbines connected with the condenser and as a result it starts working.This movement of turbine generate power in the generator which in turn start producing electricity

AI examiner evaluation

CriterionBand
Task Achievement / Task Response6.0
Coherence and Cohesion6.5
Lexical Resource6.0
Grammatical Range and Accuracy5.5
Overall6.0

Task Achievement / Task Response: Band 6.0

You describe the main sequence from cold water being pumped underground to electricity being generated, and you include the important depth of about 4.5 km. The account also correctly identifies the injection and production wells, geothermal zone, condenser, steam, turbine and generator. However, the overview that the process occurs “in a cycle” is not supported by the diagram, which shows a sequence rather than a returning loop. Some stages are also unclear or imprecise: water does not “hit” the injection well after travelling underground; it is pumped down through that well, heated by the hot rocks, and then rises through the production well. The final explanation could more clearly state that the turbine drives the generator. These gaps leave some features less fully explained than others.

Coherence and Cohesion: Band 6.5

The stages are presented in a generally logical order, and phrases such as “The first step” and “The second step” help the reader follow the process. The response also moves from the underground movement of water to the equipment at the surface. This gives it a coherent overall arrangement. However, the two-step division is not fully effective because several later stages—steam production, turbine movement and electricity generation—are compressed into one long final sentence. The opening claim that the process is a “cycle” also conflicts with the sequence that follows. To make progression clearer, use separate sentences or paragraphs for the underground heating stage and the surface electricity-generation stage, and use precise links such as “after being heated” and “subsequently.”

Lexical Resource: Band 6.0

You use a relevant range of process vocabulary, including “geothermal zone,” “injection well,” “production well,” “condenser,” “turbines” and “generator.” These terms make the subject clear, and the response attempts more specific language than a basic description would require. Some word choices and collocations are inaccurate or awkward, however. “Hit the injection well” does not describe water being pumped through it, while “steam of hot water get trapped” is not a precise account of steam being produced and directed onward. “The movement of turbine” is also an unnatural phrase. Choose verbs that express each stage accurately, such as “passes through,” “is heated,” “is converted into steam” and “drives.” This would improve precision without requiring more technical vocabulary.

Grammatical Range and Accuracy: Band 5.5

The response includes both simple statements and longer sentences with clauses, for example the sentence beginning “When it covers a distance…” and the final sentence linking the turbine, generator and electricity. The sequence remains understandable despite some grammatical errors. There are several issues with agreement and verb forms: “This diagram illustrate” should be “illustrates,” “water pass” should be “water passes,” and “This movement … generate” should be “generates.” The phrase “The steam of hot water get trapped” also has an agreement error, and the sentence beginning “When it covers…” has unclear reference. Punctuation spacing and sentence boundaries need attention as well. More accurate control of these forms, alongside shorter sentences for complex stages, would strengthen the description.

See this exact question answered at other band scores. The same prompt compared across bands.

Browse more IELTS Writing model answers or get your own writing scored by the same AI examiner.