Band 6.5 IELTS Writing Task 1 Model Answer
Overall Band Score: 6.5 · Cambridge IELTS 12 · 2026-11-26
IELTS Writing Task 1 question
The diagram below shows how geothermal energy is used to produce electricity.
Summarise the information by selecting and reporting the main features, and make comparisons where relevant.
Student answer (Band 6.5)
The diagram shows the process of electricity generation in a geothermal power plant. Hot rocks deep in the earth and water are the core elements of the proces.
Process for generating electricity in a geothermal power plant starts from a cold water reservoir, from where the cold water is pumped deep down (4.5km) the earth in the injection well. Injection well forces the water to pass througth the hot rocks which causes the water to heat up. Heated water reaches the production well from where it is pumped up, unlike the cold water.
Afterwards, heated water is condensed via Condenser and the steam is forced towards the turbine. The pressure created by the steam makes the turbine spin. At last, the rotational mechanical energy of turbine is used by generator to produce electricity and the generated electricity is supplied to the grid.
To summarize, the geothermal power plant generates electricity using these five steps, cold water pumped down, injection well passes water through geothermal zone, production well pumps hot water up, condenser produces steam, turbine spins and generator produces electricity.
AI examiner evaluation
| Criterion | Band |
|---|---|
| Task Achievement / Task Response | 6.0 |
| Coherence and Cohesion | 6.5 |
| Lexical Resource | 6.5 |
| Grammatical Range and Accuracy | 6.0 |
| Overall | 6.5 |
Task Achievement / Task Response: Band 6.0
The response covers the main sequence accurately: cold water is sent down the injection well, heated by the geothermal zone, brought up through the production well, converted to steam, and used to drive a turbine and generator. The 4.5 km depth is also reported correctly, and the opening identifies the diagram’s purpose. However, the overview is presented mainly as a repeated list of stages rather than a concise summary of the process’s overall transformation from underground heating to electricity production. Some details are also added beyond the diagram, such as steam pressure and electricity being supplied “to the grid”; these are plausible but not explicitly shown. A clearer overview and closer focus on the labelled information would make the account more complete and precise.
Coherence and Cohesion: Band 6.5
The response has a clear overall progression, moving from the underground water cycle to the surface equipment, and the paragraph break helps distinguish these phases. Sequencing expressions such as “Afterwards” and “At last” guide the reader through the process, while the final sentence recaps the stages. This organisation is effective, though the recap repeats much of the preceding description instead of adding a distinct overview. Some links are slightly mechanical, and the opening sentence of the second paragraph could connect more smoothly to the production-well stage. To strengthen cohesion further, use a concise overview and vary the transitions or connect stages through clear cause-and-effect relationships.
Lexical Resource: Band 6.5
There is an adequate range of process vocabulary, including “injection well,” “production well,” “geothermal zone,” “condensed,” and “rotational mechanical energy.” These terms help communicate the stages, and the meaning remains clear. Some choices are imprecise or awkward: “the core elements of the proces” is not a natural description, “Injection well forces the water” gives the well an unsuitable action, and “supplied to the grid” goes beyond the diagram’s wording. There are also spelling errors in “proces” and “througth.” Aim for accurate collocations such as water being “pumped through” the hot rocks and steam “driving” the turbine, while retaining the useful technical vocabulary already present.
Grammatical Range and Accuracy: Band 6.0
The response uses a mix of simple and complex forms, including relative clauses in “from where the cold water is pumped” and a contrast in “unlike the cold water.” Most stages are expressed in a comprehensible sequence, and errors do not prevent the reader from following the process. Some grammatical inaccuracies remain. The opening of the second paragraph lacks an article and a clear subject (“Process for generating electricity…”); “pumped deep down … the earth” has an incomplete prepositional construction; and “used by generator” needs an article. The final summary also has a list whose items do not all follow the same grammatical pattern. Review articles, prepositions, and parallel structure, and use a consistent present tense for process descriptions.
See this exact question answered at other band scores. The same prompt compared across bands.
Browse more IELTS Writing model answers or get your own writing scored by the same AI examiner.