IELTS Writing Task 1 question

The diagram below shows how geothermal energy is used to produce electricity.

Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

Student answer (Band 5.5)

The diagram below illustrates how geothermal energy is used to produce electricity. This process consists of five main steps starting from cold water to the turbine generator.

Firstly, cold water is pumped upto 4.5km down to the injection well from the injection well water passes to the geothermal zone in this zone water collides with the hot rocks after passing from this stage water is pumped (4.5km same as the length of pipe) up with the help of condenser. This is the fourth stage in the whole process. In this stage water turns into a steam which is the most important for producing electricity because this steam is used to run the generator.

In the last stage which is the most crucial fifth stage in the whole process because in this stage steam is used to run turbine. Turbine is used to run the generator and generator produce the electricity.

AI examiner evaluation

CriterionBand
Task Achievement / Task Response5.0
Coherence and Cohesion5.5
Lexical Resource5.5
Grammatical Range and Accuracy5.0
Overall5.5

Task Achievement / Task Response: Band 5.0

You identify the process as geothermal electricity production and mention several relevant stages, including water entering the injection well, passing through hot rocks, and steam driving machinery. However, the account is only partial and contains important inaccuracies: the water is heated underground and pumped up through the production well; the condenser is not what pumps it up. You also say steam runs the generator, whereas it powers the turbine, which in turn drives the generator. The overview is limited, and the final electricity output and the full sequence are not clearly reported. The response is also 142 words, below the required 150; the eight words copied from the task prompt were not counted. Add a concise, accurate overview and clarify each stage.

Coherence and Cohesion: Band 5.5

The response has a basic chronological structure, with an opening followed by stages and a final paragraph about the turbine and generator. Sequencing expressions such as “Firstly,” “In this stage,” and “In the last stage” help the reader follow the intended order. However, progression is weakened by the long, run-on explanation beginning “from the injection well,” which combines several stages without clear sentence boundaries. The repeated references to “stage” also make the account feel mechanical, and the relationship between the condenser, steam, turbine, and generator is not consistently clear. Use one paragraph for the underground water movement and another for electricity generation, with concise links such as “Once heated” and “The resulting steam then.”

Lexical Resource: Band 5.5

You use some relevant process vocabulary, including “injection well,” “geothermal zone,” “hot rocks,” “condenser,” and “turbine.” This gives the response a minimally adequate range for describing the diagram. However, several choices are imprecise or repetitive: “water collides with the hot rocks” is not a natural description of heat transfer, and “the most crucial” and “most important” repeat emphasis rather than explain the process. “Turbine generator” also blurs two separate components. Aim for precise process verbs and consistent technical labels, such as “flows through,” “is heated,” “production well,” and “drives.” Check spacing and forms as well, for example “4.5 km” and “electricity,” rather than “the electricity.”

Grammatical Range and Accuracy: Band 5.0

The response attempts both simple and longer sentences, but control is uneven, and several sentence structures make the process difficult to follow. The sequence beginning “from the injection well water passes…” is a run-on and needs punctuation or restructuring. There are also errors in verb forms and agreement, including “generator produce,” which should be “the generator produces,” and “water turns into a steam,” where the article is unnecessary. The phrase “water is pumped … up with the help of condenser” also needs a clearer grammatical construction to show that it rises through the production well. Use shorter, complete sentences for each stage, while retaining a few accurate complex sentences with clauses such as “After the water is heated underground…”