Band 5.5 IELTS Writing Task 1 Model Answer

Overall Band Score: 5.5 · Cambridge IELTS 12 · 2026-11-27

IELTS Writing Task 1 question

The diagram below shows how geothermal energy is used to produce electricity.

Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

Student answer (Band 5.5)

The diagram shown illustrates how geothermal energy is used to produce electricity from cold water to power generation.

firstly, the process is initiated with the cold water which is pumping down into the injection well where it travels approx 4.5km through the injection wall. The injection wall is the large substance where the 70 percent of the processs is done here.The geothermal zone (hot rocks)

takes places where the cold water passes the hot rocks which extremely changes the temperature of the water.

secondly, the converted water then pass by the production well, The production well has capabilty of storing the stimulated water.it is then pumped up to the condenser,

The condenser takes a initiative and converts the hot water into the steam, whereas the generator turbine plays a major role to produce the electricity from the steam among the condenser

in conclusion, the power generated from the generator turbine is directly connected to the power supply towers then the electricity is passed to each and every individual state ,overall the electricity generation is done through the 5 steps.

AI examiner evaluation

CriterionBand
Task Achievement / Task Response5.5
Coherence and Cohesion6.0
Lexical Resource5.0
Grammatical Range and Accuracy5.0
Overall5.5

Task Achievement / Task Response: Band 5.5

You identify the main process from cold water entering the injection well to electricity being generated, and you include the 4.5 km depth and the geothermal zone. However, several details are inaccurate or unclear: the injection well is not described as a place where “70 percent” of the process occurs, and the production well carries hot water upward rather than storing it. The account also blurs the later stages: steam powers the turbine, which drives the generator; the condenser does not itself generate electricity. The overview that the process has “5 steps” is useful, but the stages need to be reported more precisely and the final connection to the transmission pylon should not be expanded into unsupported claims about electricity reaching “each and every individual state.”

Coherence and Cohesion: Band 6.0

The response has a recognisable sequence, using “firstly,” “secondly,” and “in conclusion,” and the reader can broadly follow the movement from underground water to electricity generation. Paragraph breaks also separate the early and later stages. However, the progression is sometimes disrupted by unclear links and references: “it” in “it is then pumped up” is not fully precise, while the condenser, turbine, and generator are compressed into one long passage. The conclusion repeats the generation idea rather than clearly completing the process description. To improve, organise the account into a clear introduction and overview, followed by two stage-based paragraphs, and use linking phrases to show exactly how each component leads to the next.

Lexical Resource: Band 5.0

You use some relevant process vocabulary, including “injection well,” “production well,” “geothermal zone,” “condenser,” and “steam,” which helps identify the equipment. However, word choice and collocation are often inaccurate or imprecise, sometimes making the process difficult to understand. For example, “injection wall” is not the correct term, “the large substance” does not describe a well, and “takes a initiative” is unsuitable for explaining a machine’s function. There are also spelling and word-form problems such as “processs” and “capabilty.” Aim for precise, repeated technical terms rather than vague expressions, and check spelling. Useful alternatives include “water is pumped down,” “heated,” and “converts water into steam.”

Grammatical Range and Accuracy: Band 5.0

You attempt both simple and more extended sentence forms, including a relative clause in “where it travels” and a contrast link with “whereas.” However, control is inconsistent, and several sentence structures contain errors that make relationships between stages unclear. Examples include “the cold water which is pumping down,” where the passive form is needed, and “the converted water then pass,” where the verb does not agree with its subject. The sentence beginning “The condenser takes…” also joins several ideas without clear sentence boundaries, and capitalisation after full stops is inconsistent. Practise accurate passive constructions for process descriptions, such as “water is pumped down” and “steam is produced,” and separate each stage into complete, clearly punctuated sentences.

See this exact question answered at other band scores. The same prompt compared across bands.

Browse more IELTS Writing model answers or get your own writing scored by the same AI examiner.