Band 6.0 IELTS Writing Task 1 Model Answer

Overall Band Score: 6.0 · Cambridge IELTS 12 · 2026-11-27

IELTS Writing Task 1 question

The diagram below shows how geothermal energy is used to produce electricity.

Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

Student answer (Band 6.0)

The picture shows the process of the production of electricity with the help of geothermal energy.

Overall, electricity is produced by five steps, starting with the cold water, going through from hot rocks and ended up in turbine and generator.

At the beginning, cold water pumped in a hole which is dig upto 4.5 km in the ground, after that, the injection well is produce and water pass through the geothermal zone which is make up with the help of hot rocks and increase the temperature of that specific zone.Moreover, water reaches the second well which is known as the production well.

Furthermore, warm water is pumped up to the condenser, where steam is produce from water.In the final step, the steam from condenser build pressure which helps turbine to run, the turbine which is link with generator start producing electricity.At the end, generated electricity is transfer to electric tower which then spread the energy.

AI examiner evaluation

CriterionBand
Task Achievement / Task Response6.5
Coherence and Cohesion6.5
Lexical Resource6.0
Grammatical Range and Accuracy5.0
Overall6.0

Task Achievement / Task Response: Band 6.5

The response covers the main stages in the correct general order: cold water is sent underground, heated in the geothermal zone, brought back up, converted to steam, and used to drive a turbine and generator. The overview also identifies the process as a sequence, and the 4.5 km depth is reported accurately. These features make the account relevant and broadly complete. However, some details are unclear or imprecise: “the injection well is produce” does not explain that water passes through the well, and the description of the hot rocks as making up the zone and increasing its temperature is confusing. The final reference to electricity being spread by a tower is also less precise than explaining transmission. A clearer overview and more exact descriptions would strengthen the report.

Coherence and Cohesion: Band 6.5

The response is arranged in a sensible sequence, with an introduction, an overview, and two paragraphs describing the stages from underground heating to electricity generation. Connectors such as “At the beginning,” “Moreover,” “Furthermore,” and “In the final step” help the reader follow the process. This gives the account a coherent overall progression. Some linking is mechanical, however, and the relationship between stages is occasionally obscured by long, crowded sentences—for example, the sentence beginning “At the beginning” combines pumping, the injection well, the geothermal zone, and heating. The overview’s phrase “going through from hot rocks” is also difficult to follow. Use clearer sentence boundaries and refer explicitly to each stage so that cohesion feels more natural and the sequence is easier to track.

Lexical Resource: Band 6.0

The response uses relevant process vocabulary, including “injection well,” “production well,” “geothermal zone,” “condenser,” “turbine,” and “generator.” This range is adequate for describing the diagram, and the reader can generally understand the intended meaning. Some word choices and collocations are inaccurate or imprecise, such as “the injection well is produce,” “steam is produce,” “build pressure,” and “electric tower.” “Warm water” also understates the diagram’s description of hot water being pumped up. Aim for more precise process language and accurate word forms: for example, describe water as being heated by hot rocks, steam as being produced, and electricity as being transmitted through power lines. These refinements would make the account more natural and technically clear.

Grammatical Range and Accuracy: Band 5.0

There are attempts at complex sentences and sequencing, including “where steam is produce from water” and “which helps turbine to run,” but control is uneven. Errors occur in verb forms and sentence construction: “cold water pumped” needs a passive verb form, “the injection well is produce” is not a grammatical clause, and “steam is produce” should use the past participle. Articles and agreement are also missing in phrases such as “helps turbine” and “the turbine which is link with generator.” Several sentences run together without spaces after full stops, and the final paragraph contains a long chain of clauses. These errors sometimes make the process harder to follow. Practise accurate passive constructions and break complex descriptions into shorter, correctly punctuated sentences.

See this exact question answered at other band scores. The same prompt compared across bands.

Browse more IELTS Writing model answers or get your own writing scored by the same AI examiner.