Band 6.5 IELTS Writing Task 1 Model Answer

Overall Band Score: 6.5 · Cambridge IELTS 12 · 2026-11-28

IELTS Writing Task 1 question

The diagram below shows how geothermal energy is used to produce electricity.

Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

Student answer (Band 6.5)

The diagram displays the process of producing electricity using a geothermal energy.

Overall, the process of generating electricity consists a total of 5 stages, beginning with pumping the cold water underground and ending with producing electricity via generator.

In the first stage, cold water is pumped down 4.5 km deep into the underground, which then goes through the injection well to reach the Geothermal zone full of hot rocks. Next, the cold water flows through the hot rocks, these rocks makes the water hot. Later, the hot water runs through the production well and is pumped up to the condenser.

At the following stage, hot water stored in condenser releases steam which mainly rotates the turbine, the rotation of the turbine produces energy. Finally, the generator powered by turbine transforms the enrgy into electricity and now the generator is connected with the nearest tower in order to distribute the electricity everywhere.

AI examiner evaluation

CriterionBand
Task Achievement / Task Response7.0
Coherence and Cohesion7.0
Lexical Resource6.0
Grammatical Range and Accuracy6.0
Overall6.5

Task Achievement / Task Response: Band 7.0

The response gives a clear account of the main sequence, from pumping cold water underground to generating electricity, and includes the important 4.5 km depth and the roles of the geothermal zone, wells, condenser, turbine and generator. The overview identifies the process’s beginning and end, while the body explains how water is heated and how steam drives the turbine. This covers the key features accurately. Some details are less precise: the water is not described as being pumped down “into the underground” before going through the injection well; rather, it is pumped down that well. Also, the final claim that electricity is distributed “everywhere” goes beyond what the diagram establishes, which shows a connection to transmission infrastructure. Keep the summary tightly grounded in the visual.

Coherence and Cohesion: Band 7.0

The response is organised into an introduction, an overview and a chronological description, so the reader can follow the process from the wells to electricity generation. Sequencing phrases such as “In the first stage,” “Next,” “Later,” and “Finally” help make the order explicit, and the progression is generally clear. The main opportunity is to make links between steps more precise and less repetitive. For example, “Next,” “Later,” and “At the following stage” all perform similar sequencing work, while “these rocks” could be replaced with a clearer reference such as “the hot rocks.” The final sentence also adds a distribution point after the process has already reached electricity production. Grouping the underground and surface stages into clearer paragraphs would further strengthen the flow.

Lexical Resource: Band 6.0

The vocabulary is adequate for describing this process, with relevant terms such as “injection well,” “production well,” “condenser,” “turbine,” and “generator.” The writer also uses process language such as “pumped,” “flows,” “releases,” and “rotates,” which helps communicate the stages. However, some word choices and collocations are imprecise or repetitive: “a geothermal energy” is not natural, “hot water stored in condenser” does not accurately express the diagram’s process, and “distribute the electricity everywhere” is too broad. There is also a spelling error in “enrgy.” Aim for more exact process vocabulary and check spelling, while varying repeated references to water and stages.

Grammatical Range and Accuracy: Band 6.0

There is a mix of simple and more complex sentence forms, including the relative clause “which then goes through the injection well” and the sequence “these rocks makes the water hot.” Most of the process remains understandable, but some grammatical errors persist. In the opening, “using a geothermal energy” needs a different article construction; “consists a total of 5 stages” requires “consists of”; and “these rocks makes” has a subject–verb agreement error. The phrase “hot water stored in condenser releases steam” also needs clearer article use and sentence construction. The response would be more accurate if you checked articles, prepositions and agreement, and varied sentence patterns while keeping each stage’s subject and action clear.

See this exact question answered at other band scores. The same prompt compared across bands.

Browse more IELTS Writing model answers or get your own writing scored by the same AI examiner.