Band 5.0 IELTS Writing Task 1 Model Answer

Overall Band Score: 5.0 · Cambridge IELTS 12 · 2026-09-17

IELTS Writing Task 1 question

The diagram below shows how geothermal energy is used to produce electricity.

Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

Student answer (Band 5.0)

This diagram give us information about how geothermal energy is used to produce electricity.Its a geothermal pwoer plant and how its works to produce energy.

According to this diagram firstly the cold water 4.5 km pushed down then the injection well and to cover some distance in geothermal zone( hot rocks) and go upward through the production well and the hot water pumped up by this the third step is clear.

Therefore the hot water comes up towards the condenser, it helpes to produces steam due to hot water and helps in the process. the condenser shift the steam into the turbine through the small pipe, the then due to the power of steam it produces energy because of the power of force and steam powerd by turbine and produces electricity.

To conclude this report we can easly analysis the process of energy producing in geothermal power plan by the help of water, and then convert into hot water later it become steam and at the end it may produce energy through steam and pressure.

AI examiner evaluation

CriterionBand
Task Achievement / Task Response5.0
Coherence and Cohesion5.0
Lexical Resource5.0
Grammatical Range and Accuracy5.0
Overall5.0

Task Achievement / Task Response — Band 5.0

The response attempts to describe the main steps of the geothermal power plant diagram. The student correctly identifies the initial stage involving cold water pumped down 4.5 km into the injection well, passing through hot rocks in the geothermal zone, and returning via the production well. Key features such as the condenser, steam, turbine, and generator are also mentioned. However, the explanation of the process is somewhat confused in places, such as stating that the condenser 'shift the steam into the turbine' and mixing up the exact causal relationships between the turbine, steam, and electricity generation. While the main parts of the process are touched upon, the description lacks clarity and precision in connecting the stages logically, placing it at Band 5.0.

Coherence and Cohesion — Band 5.0

The text is divided into four paragraphs, which visually mirrors the structure of an essay. However, the logical progression within and between paragraphs is weak. Cohesive devices are either missing or misused, relying on basic transitions like 'According to this diagram firstly', 'Therefore', and 'To conclude this report'. Furthermore, referencing is unclear at times, such as 'by this the third step is clear' and 'later it become steam', which makes the sequence difficult to follow smoothly. Paragraphing is attempted, but internal cohesion is faulty and repetitive, fitting the descriptor for Band 4.5, rounded to 5.0.

Lexical Resource — Band 5.0

The vocabulary used is very basic and repetitive throughout the response. The student relies heavily on simple terms like 'information', 'diagram', 'water', 'power', and 'produce'. There are also several lexical errors and awkward word choices, such as 'pwoer plant', 'pushed down then the injection well', and 'helpes to produces steam'. Less common vocabulary is attempted with terms like 'geothermal zone', 'condenser', and 'generator', but these are mostly lifted directly from the prompt rather than demonstrating independent flexible control. Spelling and word formation errors (e.g., 'pwoer', 'helpes', 'easly', 'analysis') further restrict the lexical score to Band 4.5, rounded to 5.0.

Grammatical Range and Accuracy — Band 5.0

The grammatical range is extremely limited, consisting mostly of poorly structured run-on sentences and fragments. For example, the opening sentence 'Its a geothermal pwoer plant and how its works to produce energy' contains punctuation and structural errors. There are frequent grammatical errors, such as subject-verb agreement issues ('the condenser shift'), missing prepositions, and incorrect verb forms ('steam powerd by turbine'). Complex structures are attempted, but they are consistently faulty and frequently impede communication. Punctuation is neglected, with missing periods and commas creating confusing, multi-clause strings of thought. These persistent errors place the writing firmly in Band 4.5, rounded to 5.0.

See this exact question answered at other band scores — the same prompt compared across bands.

Browse more IELTS Writing model answers or get your own writing scored by the same AI examiner.