Band 7.5 IELTS Writing Task 1 Model Answer
Overall Band Score: 7.5 · IELTS Momentum Workout · 2026-09-25
IELTS Writing Task 1 question
The diagram below shows a town square and surrounding area in 2014 and the plans for development of the area to be completed by 2020. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.
Student answer (Band 7.5)
The maps illustrate the layout of a town square and its surrounding area in 2014 and the proposed changes to the area by 2020.
Overall, the town square is planned to undergo significant redevelopment, with several existing buildings being replaced by commercial and recreational facilities. While the town hall and fountain will remain, the fish market, history museum, library, administrative buildings and bandstand will be removed or replaced.
In 2014, the square was surrounded by a number of public and commercial buildings. The fish market was located in the north-west, while the town hall occupied the north-east corner. A history museum and a library stood along the western side, and there was a fish restaurant in the south-west. A bar was situated in the south-east. In the centre of the square were a fountain and a bandstand, while administrative buildings occupied much of the eastern side.
By 2020, the fish market is planned to be replaced by a supermarket, while the former history museum will become a local artists' gallery. The town hall will remain in its original position, although the administrative buildings on the eastern side will be replaced by several shops. The fish restaurant and bar will also give way to a larger number of bars and restaurants along the southern side. Within the square, the bandstand will disappear and be replaced by plant beds, covered seating and a children's playground. The fountain, however, will remain in approximately the same central position.
AI examiner evaluation
| Criterion | Band |
|---|---|
| Task Achievement / Task Response | 7.5 |
| Coherence and Cohesion | 7.5 |
| Lexical Resource | 7.0 |
| Grammatical Range and Accuracy | 7.5 |
| Overall | 7.5 |
Task Achievement / Task Response: Band 7.5
The student covers all parts of the task well, providing a clear overview and effectively reporting the main features and changes shown in the diagrams. The response successfully compares the 2014 layout with the proposed 2020 plans by noting which structures remain (such as the town hall and fountain) and which are replaced or added (such as the supermarket, local artists' gallery, shops, and children's playground). The information is accurate, well-selected, and fully grounded in the visual data. There are no omissions of major features or misreadings of data, meeting all requirements for a high band score.
Coherence and Cohesion: Band 7.5
The response is logically organized with a clear overall progression. It begins with a well-formulated introductory paragraph, followed by a concise overview paragraph that highlights the main general trends. The body paragraphs are logically divided, with one focusing on the 2014 layout and the subsequent one detailing the 2020 developments. Cohesive devices are used appropriately and naturally to guide the reader through the comparisons, such as 'While the town hall and fountain will remain', 'In 2014', and 'By 2020'. Paragraphing is used sufficiently and effectively to separate different temporal stages.
Lexical Resource: Band 7.0
The student uses a sufficient and flexible range of vocabulary appropriate for an Academic Task 1 response, accurately describing spatial relationships and urban changes. Less common lexical items and phrases are used effectively, such as 'proposed changes', 'undergo significant redevelopment', 'commercial and recreational facilities', and 'original position'. Word choice and collocations are generally natural, with only very occasional minor inaccuracies. Spelling and word formation are entirely correct throughout the text, demonstrating solid control over vocabulary.
Grammatical Range and Accuracy: Band 7.5
A wide variety of complex sentence structures is used throughout the response, including subordinate clauses ('While the town hall and fountain will remain, the fish market...'), passive constructions ('is planned to be replaced', 'were a fountain and a bandstand'), and participial phrases. The majority of sentences are completely error-free, and the grammar and punctuation are handled with a high degree of control. Minor slips are virtually absent, and the structural variety allows the writer to convey precise comparative and temporal information smoothly.
See this exact question answered at other band scores. The same prompt compared across bands.
Browse more IELTS Writing model answers or get your own writing scored by the same AI examiner.
