Band 5.5 IELTS Writing Task 1 Model Answer
Overall Band Score: 5.5 · Cambridge IELTS 13 · 2026-08-24
IELTS Writing Task 1 question
The two maps below show road access to a city hospital in 2007 and 2010.
Summarize the information by selecting and reporting the main features and make comparisons wherever relevant.
Student answer (Band 5.5)
The map presents the alterations in road access of city hospital from 2007 to 2010.
Overall, during the given period between 2007 and 2010 considerable modifications are made in the south side of the city hospital road whereas new infrastructure is been added to it.
Initially, in the east side of city hospital, a new public car park is been added which is attached to the ring road However on the west and north division no modification has been made.
In the contrast, in south east side public car park and bus stop is rebuilt to staff car park and bus stop is completly removed and two new roundabouts are constructed one is in the middle of the hospital road and other in south division of city road.Furthermore, on the south west side bus stop have been completly upgraded to the bus station where people can access it more conveniently.
AI examiner evaluation
| Criterion | Band |
|---|---|
| Task Achievement / Task Response | 5.5 |
| Coherence and Cohesion | 5.5 |
| Lexical Resource | 5.5 |
| Grammatical Range and Accuracy | 5.0 |
| Overall | 5.5 |
Task Achievement / Task Response — Band 5.5
The response covers the main features of the maps, identifying the key changes such as the new car park, roundabouts, and the bus station upgrade. However, the description is somewhat imprecise; for example, stating that 'no modification has been made' on the north and west sides is inaccurate, as the maps show the addition of a new road leading to the hospital from the north. The overview is present but could be more clearly articulated to highlight the most significant trends. While the main features are reported, the lack of precision in describing the road network changes limits the score.
Coherence and Cohesion — Band 5.5
The response is organised into an introduction, an overview, and two body paragraphs, which provides a logical structure. Cohesive devices are used, such as 'Initially', 'In the contrast', and 'Furthermore', though some are used incorrectly or awkwardly (e.g., 'In the contrast' should be 'In contrast'). The progression of ideas is generally clear, but the referencing is occasionally mechanical. Paragraphing is used appropriately to separate the different areas of the hospital grounds, which helps the reader follow the spatial changes described.
Lexical Resource — Band 5.5
The vocabulary is adequate for the task, allowing for the description of infrastructure changes like 'roundabouts', 'infrastructure', and 'upgraded'. However, there are several instances of awkward word choice and collocation errors, such as 'alterations in road access of city hospital' instead of 'to the city hospital' and 'is been added' (a grammatical error affecting lexical precision). The range is somewhat limited, relying on repetitive phrasing. To reach a higher band, you should aim for more precise terminology regarding map features and avoid basic errors in word formation.
Grammatical Range and Accuracy — Band 5.0
The response contains a mix of simple and some complex structures, but there are frequent grammatical errors that occasionally impede clarity. Specifically, there are persistent issues with passive voice construction, such as 'is been added' and 'bus stop have been completly upgraded'. Subject-verb agreement is also inconsistent, for example, 'two new roundabouts are constructed one is...'. Punctuation is weak, with missing commas and run-on sentences, such as 'ring road However on the west'. These errors are frequent enough to prevent the response from reaching a higher band.
See this exact question answered at other band scores — the same prompt compared across bands.
Browse more IELTS Writing model answers or get your own writing scored by the same AI examiner.
