Band 6.0 IELTS Writing Task 1 Model Answer
Overall Band Score: 6.0 · Cambridge IELTS 13 · 2026-09-13
IELTS Writing Task 1 question
The plans below show the layout of a university’s sports centre now, and how it will look after redevelopment.
Summarize the information by selecting and reporting the main features, and make comparisons where relevant.
Student answer (Band 6.0)
The maps illustrate the layout of university sports centre at present and a plan for its future redevelopment.
Overall, the area of university's sport centre is expected to be extended, with several new facilities being added and some of the original features removed. Some facilities is planned, such as a sports hall, dance studios, changing rooms, a cafe, a sports shop and a leisure pool. A few things like the entrance, a gym, a changing room, the reception, a seating block and 25m pool is likely to be remained unchanged, while the outdoor courts is planned to removed.
Currently, a reception is located in the south entrance and a gym in the northern part. There is a 25m pool present in the middle of university sport centre, with a seating to its right and a changing room to its left. Two outdoor courts are located on either side of sport centre.
In the future, the area is planned to expended towards the west and east side, with several new facilities added in the enlarged section. The gym area will be extended to the east. Two outdoors courts are likely to be removed, while some features, such as a 25m pool, a changing room, a seating, the reception and an entrance will remain unchanged. A sports hall and two dance studios is planned in the place of right outdoor courts, with a changing room in the bottom-right corner and a cafe to its left. The left outdoor courts will be converted into the leisure pool and a changing room in the bottom-left corner with a sports shop to its right.
AI examiner evaluation
| Criterion | Band |
|---|---|
| Task Achievement / Task Response | 6.5 |
| Coherence and Cohesion | 6.0 |
| Lexical Resource | 5.5 |
| Grammatical Range and Accuracy | 5.5 |
| Overall | 6.0 |
Task Achievement / Task Response — Band 6.5
The student has successfully covered all parts of the task by summarising the main features of the university sports centre maps and making relevant comparisons between the present layout and the proposed future redevelopment. The overview clearly highlights the main trends, noting that the area will be extended with new facilities added and some original features removed. Key details such as the retention of the 25m pool and reception, the removal of the outdoor courts, and the addition of a leisure pool, sports hall, dance studios, and cafe are accurately reported. The response is well-structured and fully satisfies the requirements of Academic Task 1, earning a solid band score for this criterion.
Coherence and Cohesion — Band 6.0
The response demonstrates a clear overall progression and logical organisation. The writing is divided into appropriate paragraphs, starting with an introduction and overview, followed by a description of the current layout, and concluding with the future changes. Cohesive devices are used reasonably well, such as 'Overall', 'Currently', and 'In the future', which help to structure the information logically. However, referencing is occasionally repetitive, and some spatial relationships could be linked more fluidly. Paragraphing is used sufficiently, ensuring the reader can easily follow the comparison between the two maps.
Lexical Resource — Band 5.5
The student uses an adequate range of vocabulary suitable for the task, successfully employing terms related to architectural changes and facilities, such as 'layout', 'redevelopment', 'extended', 'retained', and 'converted'. However, there are some inaccuracies in word choice and morphology, such as 'expended' instead of 'expanded' and 'remained unchanged' instead of 'remain unchanged'. While less common lexical items are attempted, occasional errors in collocation and form prevent the response from reaching a higher band. Nevertheless, the vocabulary is sufficient to communicate the information clearly without impeding the reader.
Grammatical Range and Accuracy — Band 5.5
The response displays a mix of simple and complex sentence forms, with attempts at passive structures and conditional descriptions of future plans (e.g., 'is planned to be extended', 'will be removed'). However, there are noticeable grammatical errors, particularly with subject-verb agreement, such as 'Some facilities is planned' and 'A sports hall and two dance studios is planned', as well as incorrect verb forms like 'planned to removed'. The majority of simple sentences are accurate, but errors in complex structures and passive forms persist, which places this performance firmly in the Band 6 range.
See this exact question answered at other band scores — the same prompt compared across bands.
Browse more IELTS Writing model answers or get your own writing scored by the same AI examiner.
