Band 6.0 IELTS Writing Task 1 Model Answer
Overall Band Score: 6.0 · Cambridge IELTS 14 · 2026-09-20
IELTS Writing Task 1 question
The plans below show a public park when it first opened in 1920 and the same park today.
Summarise the information by selecting and reporting the main features, and make comparisons where relevant.
Student answer (Band 6.0)
The given map illustrates the architectural layout of a public park from its opening in 1920 to present time.
Overall, the fountain in the center has been replaced with a rose garden and the stage for musicians is converted into a amphitheatre for concerts. Moreover, children's play area is built in place of the pond for water plants and the glass house is removed in order to construct a water feature.
In details, the rose garden near the Eldon street is moved to the center with some sitting arrangements and the rose garden near the Arnold avenue is replaced with a cafe.
A children's play area is also introduced beside the cafe where pond existed in 1920. An underground car park entrance has also been made along the Eldon Street which led to the water feature in the corner of the park. In addition, the stage for the musicians has been replaced with a amphitheatre for concerts.
AI examiner evaluation
| Criterion | Band |
|---|---|
| Task Achievement / Task Response | 6.0 |
| Coherence and Cohesion | 5.5 |
| Lexical Resource | 5.5 |
| Grammatical Range and Accuracy | 6.0 |
| Overall | 6.0 |
Task Achievement / Task Response — Band 6.0
The student successfully identifies and reports the main features and changes shown in the maps of Grange Park between 1920 and today. An overview is provided in the second paragraph, capturing key transformations such as the removal of the central fountain and the stage. The major changes—including the new café, children's play area, amphitheatre, and underground car park entrance—are correctly located and contrasted against the 1920 layout. While the breakdown of details could be slightly more synthesised, the response covers all key spatial shifts accurately, fulfilling the requirements for Task Achievement at a Band 6.5 to 7.0 level.
Coherence and Cohesion — Band 5.5
The response is arranged logically with a clear overall progression from an introductory overview to specific spatial details in subsequent paragraphs. Paragraphing is used appropriately to separate general trends from specific location changes. Cohesive devices are generally present ('Overall', 'Moreover', 'In details'), though some transitions feel slightly mechanical or awkward, such as 'In details' instead of 'In detail'. Referencing is mostly clear, though the flow between sentences could be smoother to achieve a higher band.
Lexical Resource — Band 5.5
The vocabulary used is adequate for the task, attempting some less common collocations and topic-specific terms such as 'architectural layout', 'amphitheatre', and 'underground car park'. However, there are minor lexical inaccuracies, such as writing 'glass house' as two words and using 'in details' instead of 'in detail'. The range is sufficient to convey the message clearly without communication being impeded, though more precise synonyms would elevate the response.
Grammatical Range and Accuracy — Band 6.0
The student demonstrates a mix of simple and complex sentence forms, utilizing passive structures effectively (e.g., 'has been replaced', 'is built'). There are some minor grammatical errors and articles issues, such as omitting an article or using an incorrect one ('an amphitheatre' is correct, but 'into a amphitheatre' contains a minor slip given the pronunciation, and 'children's play area' lacks a determiner). Punctuation is generally fine, and complex structures do not cause confusion for the reader.
See this exact question answered at other band scores — the same prompt compared across bands.
Browse more IELTS Writing model answers or get your own writing scored by the same AI examiner.
